Back to project stories

4 min read

Insulation Hidden Behind Plasterboard

The wrong product was installed, then quietly covered up. Final inspection caught it.

What happened

An extension's wall insulation was specified at 100mm rigid PIR. Site delivery records showed only 75mm boards arrived. By the time anyone checked, the plasterboard was on and the walls were skimmed.

Would you have spotted this?

How it was discovered

Final inspection. The U-value calculation in the Building Regulations submission could not be reconciled with the installed thickness.

The consequences

Two walls opened up to verify, additional internal lining added to achieve the U-value, redecoration. Significant cost and four weeks of additional time.

What homeowners can learn

Photograph insulation before plasterboard. Always. It is the single highest-leverage record on any extension.

Coming soon

The Homeowner Survival Guide

47 pages. Real photos. The 12 mistakes we see homeowners make every week — and how to spot them before they cost you thousands. Currently in the final edit — available shortly.

Free Download

Get the Homeowner Survival Guide

47 pages. Real photos. The 12 mistakes we see homeowners make every week — and how to spot them before they cost you thousands.

No spam. Unsubscribe any time. We never share your address.