Work covered before inspection
Plasterboard over insulation, screed over underfloor heating, paving over drainage. Once it is covered, it has to be uncovered. Book the visit before you cover up.
Wrong product on site
Specified insulation substituted for a thinner alternative. Specified fire board replaced with standard plasterboard. Always check what arrives matches what was approved.
Drawings out of date
A revised drawing the builder did not get. Working to the wrong revision means doing it twice.