Work to the engineer's drawings
Not the architect's, not the original drawings. The latest engineer's drawings, on site, signed and dated.
Padstones and bearings
Specified size, specified material, specified location. Photograph each before the beam goes on.
Fire protection of steel
Often forgotten until final inspection. Plan it into the programme, not into the snagging list.